How we calculate
We check each sourced figure at least twice a year, and sooner if the statute, regulation, or IRS publication changes. The date on an entry is the day we last confirmed that citation.
Only a verified entry is shown on the public pages, in the structured data, and in any logic that would otherwise print a benchmark. An unverified entry has no number. The calculators still run, because you type the missing inputs yourself.
The five calculators are the severance pay calculator, the solar panel cost calculator, the closing cost calculator, the seller net sheet calculator, and the crawl space encapsulation cost calculator.
Severance formula
- When salary is entered by the month, annual salary = monthly salary × 12.
- Weekly pay = annual salary ÷ 52.
- Monthly pay = annual salary ÷ 12.
- Severance = weekly pay × weeks per year × years of service.
- Notice pay = weekly pay × notice weeks. This line is separate from severance.
- Bonus is the dollar amount you enter. It is not multiplied by years.
- Package = severance + notice pay + bonus.
- Weeks of pay = weeks per year × years of service.
- Months of pay = severance ÷ monthly pay, when monthly pay is not zero.
- Take-home estimate = severance × (1 − tax rate ÷ 100), and only if you enter a rate.
- Negative inputs are clamped to zero before the formula runs.
- Displayed money is rounded half up to two decimals after the full calculation, not between steps.
There are 52 weeks in the divisor and 12 months in a year. The form does not divide a monthly salary by 4.33.
Solar formula
- When you enter a monthly bill, monthly kWh = monthly bill ÷ electricity rate. If the rate is zero, monthly kWh is not available.
- Annual kWh = monthly kWh × 12.
- System size (kW) = annual kWh ÷ production factor. The production factor is kWh per kW per year.
- Gross cost = system size (kW) × 1,000 × cost per watt.
- Incentive amount = gross cost × incentive percent ÷ 100.
- Net cost = gross cost − incentive amount.
- Annual savings = annual kWh × electricity rate.
- Payback (years) = net cost ÷ annual savings. If annual savings are zero, payback is not available.
- 25-year savings = annual savings × 25 − net cost.
- Negative inputs are clamped to zero. Incentive percent is capped at 100.
- Displayed amounts are rounded half up to two decimals after each full line, not by rounding system size before gross cost.
The production factor is already in kilowatt-hours per kilowatt-year, so system size is annual kWh divided by that factor. Gross cost then multiplies kilowatts by 1,000 to reach watts.
Closing cost formula
- Florida deed stamps equal the count of 100 dollar units, rounded up, times 0.70 dollars. In Miami-Dade a single-family residence uses 0.60 dollars. Any other Miami-Dade property uses 0.60 plus a 0.45 surtax.
- Florida note stamps equal the count of 100 dollar units of the loan, rounded up, times 0.35 dollars. The intangible tax on the mortgage is not included.
- Texas title premium, for a policy amount over 100,000 dollars, subtracts the band figure, multiplies by that band's rate, rounds the product to the nearest dollar, then adds the band's flat amount. At 100,000 dollars or below, the line says enter your quote.
- California county transfer tax, when consideration exceeds 100 dollars, equals the count of 500 dollar units, rounded up, times 0.55 dollars. A city tax is calculated only for the cities listed below.
- Los Angeles city base tax equals the count of 500 dollar units, rounded up, times 2.25 dollars, which is 0.45 percent. Measure ULA adds 4 percent of the whole value above 5,400,000 dollars, and 5.5 percent at 10,900,000 dollars or more. ULA is not rounded to 500 dollar units and is charged on the entire value, not on the excess.
- San Francisco transfer tax equals the count of 500 dollar units, rounded up, times the rate for the band the value falls in: 2.50 dollars up to 250,000, then 3.40, 3.75, 11.25, 27.50, and 30.00 dollars. The band rate applies to the whole value. San Francisco is a consolidated city and county, so this replaces the county line rather than adding to it.
- New York transfer tax equals the count of 500 dollar units, rounded up, times 2.00 dollars, and applies only where consideration exceeds 500 dollars. The mansion tax adds 1 percent of the whole price on a residence at 1,000,000 dollars or more.
- Pennsylvania realty transfer tax is 1 percent of the value, with no unit rounding. Municipal and school district taxes are levied on top and are not calculated.
- Washington's real estate excise tax is graduated: each portion of the selling price is taxed at its own rate, 1.10 percent through 525,000 dollars, then 1.28, 2.75 and 3.00 percent. A 5.00 dollar technology fee applies to every transfer.
- Nevada transfer tax equals the count of 500 dollar units, rounded up, times 1.95 dollars, where the value exceeds 100 dollars. Clark County adds 0.60 dollars, Washoe and Churchill add 0.10 dollars.
- Lender fees, appraisal, recording, and a city amount are the dollars you type. They are not benchmarks. A line that says enter your quote is left out of the total.
- The percent of price is the total divided by the purchase price. If the price is zero, that percent is not available.
There is no national closing-cost percent in the table below. The Florida, Texas, and California rows are the cited rates only.
Seller net sheet formula
- Net proceeds equal the sale price minus every deduction below it. Nothing is added back.
- Commission equals the sale price times the percent you type, divided by 100. There is no published national commission rate, so the percent is yours and the field starts empty.
- Seller closing costs are the statutory lines for the state, taken from the closing cost calculator at the same price: Florida deed stamps, the Texas promulgated owner's premium, or the California county transfer tax. The Florida note stamp is the borrower's and is left out.
- Mortgage payoff, repairs or credits, and other seller costs are the dollars you type. They are not benchmarks.
- A net figure below zero is shown as a negative number rather than clipped to zero.
Crawl space encapsulation formula
- Installed encapsulation is area × $3 to area × $10, the published per-square-foot range.
- A barrier thicker than 6 mil adds the difference between that thickness and 6 mil on the materials-only table.
- Sealing, inspection, insulation, removal, drainage, a dehumidifier, and mold remediation are added only when selected.
- Old insulation removal is $1–$2 per square foot. Mold remediation is $15–$30 per square foot.
- Each displayed endpoint is rounded half up to the cent after that line is complete. The total rounds after the sum.
- The sanity check is area × $3 to area × $10. It is the typical size band, not a second total.
The figures are published US cost ranges from one industry guide. They are not quotes and they are not a state schedule. Cleaning, foundation repair, and the insulation-per-square-foot note sit in the source table. They are not fields on the form.
One sourced production example
The EPA, citing NREL PVWatts, describes a Kansas City open-rack system of 1,017.14 kW producing 1,455,726 kWh a year. Dividing those two figures and rounding half up gives 1,431.20 kWh per kW-year. That array is a commercial or small utility example. It is not the number in the solar form, and it is not a home rooftop default.
Verified sources
| Figure | Value | Source | Checked |
|---|---|---|---|
| US federal severance requirement | ValueNo FLSA requirement | SourceSeverance Pay, U.S. Department of Labor (2026-10-09) | Checked2026-10-09 |
| WARN advance notice | Value60 calendar days | SourcePlant Closings and Layoffs, U.S. Department of Labor (2026-10-09) | Checked2026-10-09 |
| Canada Labor Code severance minimum | ValueGreater of 2 days' wages per completed year or 5 days' wages | SourceCanada Labor Code, section 235 (2026-09-21) | Checked2026-10-09 |
| India retrenchment compensation under section 25F | Value15 days' average pay per completed year, or any part over six months | SourceIndustrial Disputes Act, 1947, section 25F (2026-10-09) | Checked2026-10-09 |
| Jammu and Kashmir and Ladakh retrenchment compensation | Value30 days' average pay in place of 15 under the cited adaptation orders | SourceIndustrial Disputes Act, 1947, section 25F state amendment note (2026-10-09) | Checked2026-10-09 |
| South Africa statutory severance minimum | ValueAt least 1 week's remuneration per completed year of continuous service | SourceBasic Conditions of Employment Act, 1997, section 41 (2026-10-09) | Checked2026-10-09 |
| US severance included in income | ValueSeverance pay is included in income | SourceIRS Publication 525 (2025), Taxable and Nontaxable Income (2025-01-01) | Checked2026-10-09 |
| US severance employment taxes | ValueWages subject to Social Security, Medicare, income tax withholding, and FUTA | SourceIRS Publication 15 (2026), Employer's Tax Guide (2025-12-15) | Checked2026-10-09 |
| US Social Security employee tax rate for 2026 | Value6.2 percent | SourceIRS Publication 15 (2026), Employer's Tax Guide (2025-12-15) | Checked2026-10-09 |
| US Social Security wage base for 2026 | Value184500 USD | SourceIRS Publication 15 (2026), Employer's Tax Guide (2025-12-15) | Checked2026-10-09 |
| US Medicare employee tax rate for 2026 | Value1.45 percent | SourceIRS Publication 15 (2026), Employer's Tax Guide (2025-12-15) | Checked2026-10-09 |
| US Additional Medicare Tax withholding threshold for 2026 | Value0.9 percent above 200000 USD of wages in the calendar year | SourceIRS Publication 15 (2026), Employer's Tax Guide (2025-12-15) | Checked2026-10-09 |
| US supplemental wage withholding rates for 2026 | Value22 percent, or 37 percent above 1 million USD of supplemental wages | SourceIRS Publication 15 (2026), Employer's Tax Guide (2025-12-15) | Checked2026-10-09 |
| COBRA continuation length after a termination | Value18 months | SourceCOBRA Continuation Coverage, U.S. Department of Labor (2026-10-09) | Checked2026-10-09 |
| COBRA election window | Value60 days | SourceCOBRA Continuation Coverage, U.S. Department of Labor (2026-10-09) | Checked2026-10-09 |
| US residential clean energy credit rate for property installed 2022 through 2025 | Value30 percent | SourceIRS Residential Clean Energy Credit (2026-10-09) | Checked2026-10-09 |
| US residential clean energy credit for property placed in service after 2025 | Value0 percent | SourceIRS Residential Clean Energy Credit (2026-10-09) | Checked2026-10-09 |
| EPA Kansas City open-rack example, DC system size | Value1017.14 kW | SourceEPA Green Power Equivalency Calculator, calculations and references (2026-10-09) | Checked2026-10-09 |
| EPA Kansas City open-rack example, annual output | Value1455726 kWh per year | SourceEPA Green Power Equivalency Calculator, calculations and references (2026-10-09) | Checked2026-10-09 |
| Florida documentary stamp tax on deeds | Value0.70 USD per 100 USD of consideration, or portion | SourceDocumentary Stamp Tax, GT-800014, Florida Department of Revenue (2026-10-09) | Checked2026-10-09 |
| Florida documentary stamp tax on deeds, Miami-Dade single-family residence | Value0.60 USD per 100 USD of consideration, or portion | SourceDocumentary Stamp Tax, GT-800014, Florida Department of Revenue (2026-10-09) | Checked2026-10-09 |
| Florida documentary stamp surtax, Miami-Dade property other than a single-family residence | Value0.45 USD per 100 USD, added to the 0.60 rate | SourceDocumentary Stamp Tax, GT-800014, Florida Department of Revenue (2026-10-09) | Checked2026-10-09 |
| Florida documentary stamp tax on notes and mortgages | Value0.35 USD per 100 USD of the obligation, or portion | SourceDocumentary Stamp Tax, GT-800014, Florida Department of Revenue (2026-10-09) | Checked2026-10-09 |
| Texas title premium, policies from 100,001 through 1,000,000 USD | Value0.00494 after subtracting 100000 USD, round to the nearest dollar, then add 780 USD (through 1000000 USD) | SourceTexas Title Insurance Premium Rates, effective March 1, 2026, Texas Department of Insurance, Commissioner's Order 2025-9697 (2026-03-01) | Checked2026-10-09 |
| Texas title premium, policies from 1,000,001 through 5,000,000 USD | Value0.00406 after subtracting 1000000 USD, round to the nearest dollar, then add 5226 USD (through 5000000 USD) | SourceTexas Title Insurance Premium Rates, effective March 1, 2026, Texas Department of Insurance, Commissioner's Order 2025-9697 (2026-03-01) | Checked2026-10-09 |
| Texas title premium, policies from 5,000,001 through 15,000,000 USD | Value0.00335 after subtracting 5000000 USD, round to the nearest dollar, then add 21466 USD (through 15000000 USD) | SourceTexas Title Insurance Premium Rates, effective March 1, 2026, Texas Department of Insurance, Commissioner's Order 2025-9697 (2026-03-01) | Checked2026-10-09 |
| Texas title premium, policies from 15,000,001 through 25,000,000 USD | Value0.00238 after subtracting 15000000 USD, round to the nearest dollar, then add 54966 USD (through 25000000 USD) | SourceTexas Title Insurance Premium Rates, effective March 1, 2026, Texas Department of Insurance, Commissioner's Order 2025-9697 (2026-03-01) | Checked2026-10-09 |
| Texas title premium, policies from 25,000,001 through 50,000,000 USD | Value0.00143 after subtracting 25000000 USD, round to the nearest dollar, then add 78766 USD (through 50000000 USD) | SourceTexas Title Insurance Premium Rates, effective March 1, 2026, Texas Department of Insurance, Commissioner's Order 2025-9697 (2026-03-01) | Checked2026-10-09 |
| Texas title premium, policies from 50,000,001 through 100,000,000 USD | Value0.00129 after subtracting 50000000 USD, round to the nearest dollar, then add 114516 USD (through 100000000 USD) | SourceTexas Title Insurance Premium Rates, effective March 1, 2026, Texas Department of Insurance, Commissioner's Order 2025-9697 (2026-03-01) | Checked2026-10-09 |
| Texas title premium, policies over 100,000,000 USD | Value0.00116 after subtracting 100000000 USD, round to the nearest dollar, then add 179016 USD (no upper limit) | SourceTexas Title Insurance Premium Rates, effective March 1, 2026, Texas Department of Insurance, Commissioner's Order 2025-9697 (2026-03-01) | Checked2026-10-09 |
| California county documentary transfer tax | Value0.55 USD per 500 USD of consideration or value, or fractional part, when that amount exceeds 100 USD | SourceCalifornia Revenue and Taxation Code section 11911 (2026-10-09) | Checked2026-10-09 |
| New York State real estate transfer tax | Value2.00 USD per 500 USD of consideration, or fractional part, when consideration exceeds 500 USD | SourceReal estate transfer tax, New York State Department of Taxation and Finance (2026-11-07) | Checked2026-10-09 |
| New York State additional tax, the mansion tax | Value1 percent of the whole sale price, residences at 1,000,000 USD or more | SourceReal estate transfer tax, New York State Department of Taxation and Finance (2026-11-07) | Checked2026-10-09 |
| Pennsylvania realty transfer tax | Value1 percent of the value of the real estate transferred | SourceRealty Transfer Tax, Pennsylvania Department of Revenue (2026-11-07) | Checked2026-10-09 |
| Washington state REET on the portion of the selling price through 525000 USD | Value1.10 percent of that portion | SourceReal estate excise tax, Washington State Department of Revenue (2026-11-07) | Checked2026-10-09 |
| Washington state REET on the portion of the selling price through 1525000 USD | Value1.28 percent of that portion | SourceReal estate excise tax, Washington State Department of Revenue (2026-11-07) | Checked2026-10-09 |
| Washington state REET on the portion of the selling price through 3025000 USD | Value2.75 percent of that portion | SourceReal estate excise tax, Washington State Department of Revenue (2026-11-07) | Checked2026-10-09 |
| Washington state REET on the portion of the selling price above 3,025,000 USD | Value3.00 percent of that portion | SourceReal estate excise tax, Washington State Department of Revenue (2026-11-07) | Checked2026-10-09 |
| Washington state technology fee | Value5.00 USD on every transfer | SourceReal estate excise tax, Washington State Department of Revenue (2026-11-07) | Checked2026-10-09 |
| Georgia transfer tax on the first 1,000 USD of the sale price | Value1.00 USD flat, for the first 1,000 USD or fractional part | SourceGeorgia Department of Revenue, Real Estate Transfer Tax (2026-11-22) | Checked2026-10-09 |
| Georgia transfer tax above the first 1,000 USD | Value0.10 USD per 100 USD, or fractional part | SourceGeorgia Department of Revenue, Real Estate Transfer Tax (2026-11-22) | Checked2026-10-09 |
| Georgia intangible recording tax on the note | Value1.50 USD per 500 USD of face amount, or fractional part | SourceGeorgia Department of Revenue, Intangible Recording Tax (2026-11-22) | Checked2026-10-09 |
| Georgia intangible recording tax, maximum on any single note | Value25000 USD | SourceGeorgia Department of Revenue, Intangible Recording Tax (2026-11-22) | Checked2026-10-09 |
| Nevada real property transfer tax, general rate | Value1.95 USD per 500 USD of value, or fraction, where the value exceeds 100 USD | SourceReal Property Transfer Tax, Nevada Department of Taxation (2026-11-07) | Checked2026-10-09 |
| Nevada transfer tax addition, Clark County | Value0.60 USD per 500 USD, added to the 1.95 base rate | SourceReal Property Transfer Tax, Nevada Department of Taxation (2026-11-07) | Checked2026-10-09 |
| Nevada transfer tax addition, Washoe and Churchill Counties | Value0.10 USD per 500 USD, added to the 1.95 base rate | SourceReal Property Transfer Tax, Nevada Department of Taxation (2026-11-07) | Checked2026-10-09 |
| Encapsulation installed cost per square foot | Value3–10 USD per sq ft | SourceHow Much Does Crawl Space Encapsulation Cost? (2026), HomeGuide, written by Jennifer Carlson (2026-01-14) | Checked2026-10-10 |
| Typical encapsulation total | Value3000–15000 USD | SourceHow Much Does Crawl Space Encapsulation Cost? (2026), HomeGuide, written by Jennifer Carlson (2026-01-14) | Checked2026-10-10 |
| Crawl space inspection | Value100–250 USD | SourceHow Much Does Crawl Space Encapsulation Cost? (2026), HomeGuide, written by Jennifer Carlson (2026-01-14) | Checked2026-10-10 |
| Cleaning or repairs, if required | Value500–8000 USD | SourceHow Much Does Crawl Space Encapsulation Cost? (2026), HomeGuide, written by Jennifer Carlson (2026-01-14) | Checked2026-10-10 |
| Insulation installation | Value500–3700 USD | SourceHow Much Does Crawl Space Encapsulation Cost? (2026), HomeGuide, written by Jennifer Carlson (2026-01-14) | Checked2026-10-10 |
| Insulation cost per square foot | Value1.00–4.50 USD per sq ft | SourceHow Much Does Crawl Space Encapsulation Cost? (2026), HomeGuide, written by Jennifer Carlson (2026-01-14) | Checked2026-10-10 |
| Vapor barrier installation | Value1200–4000 USD | SourceHow Much Does Crawl Space Encapsulation Cost? (2026), HomeGuide, written by Jennifer Carlson (2026-01-14) | Checked2026-10-10 |
| Vapor barrier with installation | Value2–4 USD per sq ft | SourceHow Much Does Crawl Space Encapsulation Cost? (2026), HomeGuide, written by Jennifer Carlson (2026-01-14) | Checked2026-10-10 |
| Sealing vents and holes | Value150–450 USD | SourceHow Much Does Crawl Space Encapsulation Cost? (2026), HomeGuide, written by Jennifer Carlson (2026-01-14) | Checked2026-10-10 |
| Dehumidifier installation | Value1000–3500 USD | SourceHow Much Does Crawl Space Encapsulation Cost? (2026), HomeGuide, written by Jennifer Carlson (2026-01-14) | Checked2026-10-10 |
| Drainage system, French or perimeter drain | Value800–3000 USD | SourceHow Much Does Crawl Space Encapsulation Cost? (2026), HomeGuide, written by Jennifer Carlson (2026-01-14) | Checked2026-10-10 |
| Old insulation removal per square foot | Value1–2 USD per sq ft | SourceHow Much Does Crawl Space Encapsulation Cost? (2026), HomeGuide, written by Jennifer Carlson (2026-01-14) | Checked2026-10-10 |
| Mold remediation per square foot | Value15–30 USD per sq ft | SourceHow Much Does Crawl Space Encapsulation Cost? (2026), HomeGuide, written by Jennifer Carlson (2026-01-14) | Checked2026-10-10 |
| Mold remediation, typical crawl space | Value1500–4000 USD | SourceHow Much Does Crawl Space Encapsulation Cost? (2026), HomeGuide, written by Jennifer Carlson (2026-01-14) | Checked2026-10-10 |
| Foundation repair, minor cracks | Value250–800 USD | SourceHow Much Does Crawl Space Encapsulation Cost? (2026), HomeGuide, written by Jennifer Carlson (2026-01-14) | Checked2026-10-10 |
| Foundation repair, major | Value4500–20000 USD | SourceHow Much Does Crawl Space Encapsulation Cost? (2026), HomeGuide, written by Jennifer Carlson (2026-01-14) | Checked2026-10-10 |
| Installed encapsulation cost for 1000 sq ft | Value3000–10000 USD | SourceHow Much Does Crawl Space Encapsulation Cost? (2026), HomeGuide, written by Jennifer Carlson (2026-01-14) | Checked2026-10-10 |
| Installed encapsulation cost for 1500 sq ft | Value4500–15000 USD | SourceHow Much Does Crawl Space Encapsulation Cost? (2026), HomeGuide, written by Jennifer Carlson (2026-01-14) | Checked2026-10-10 |
| Installed encapsulation cost for 2000 sq ft | Value6000–20000 USD | SourceHow Much Does Crawl Space Encapsulation Cost? (2026), HomeGuide, written by Jennifer Carlson (2026-01-14) | Checked2026-10-10 |
| Installed encapsulation cost for 2500 sq ft | Value7500–25000 USD | SourceHow Much Does Crawl Space Encapsulation Cost? (2026), HomeGuide, written by Jennifer Carlson (2026-01-14) | Checked2026-10-10 |
| Installed encapsulation cost for 3000 sq ft | Value9000–30000 USD | SourceHow Much Does Crawl Space Encapsulation Cost? (2026), HomeGuide, written by Jennifer Carlson (2026-01-14) | Checked2026-10-10 |
| 6 mil vapor barrier material per square foot | Value0.30–0.35 USD per sq ft | SourceHow Much Does Crawl Space Encapsulation Cost? (2026), HomeGuide, written by Jennifer Carlson (2026-01-14) | Checked2026-10-10 |
| 6 mil vapor barrier material per 1,200 sq ft roll | Value360–420 USD | SourceHow Much Does Crawl Space Encapsulation Cost? (2026), HomeGuide, written by Jennifer Carlson (2026-01-14) | Checked2026-10-10 |
| 8 mil vapor barrier material per square foot | Value0.35–0.40 USD per sq ft | SourceHow Much Does Crawl Space Encapsulation Cost? (2026), HomeGuide, written by Jennifer Carlson (2026-01-14) | Checked2026-10-10 |
| 8 mil vapor barrier material per 1,200 sq ft roll | Value420–480 USD | SourceHow Much Does Crawl Space Encapsulation Cost? (2026), HomeGuide, written by Jennifer Carlson (2026-01-14) | Checked2026-10-10 |
| 10 mil vapor barrier material per square foot | Value0.40–0.50 USD per sq ft | SourceHow Much Does Crawl Space Encapsulation Cost? (2026), HomeGuide, written by Jennifer Carlson (2026-01-14) | Checked2026-10-10 |
| 10 mil vapor barrier material per 1,200 sq ft roll | Value480–600 USD | SourceHow Much Does Crawl Space Encapsulation Cost? (2026), HomeGuide, written by Jennifer Carlson (2026-01-14) | Checked2026-10-10 |
| 12 mil vapor barrier material per square foot | Value0.50–0.60 USD per sq ft | SourceHow Much Does Crawl Space Encapsulation Cost? (2026), HomeGuide, written by Jennifer Carlson (2026-01-14) | Checked2026-10-10 |
| 12 mil vapor barrier material per 1,200 sq ft roll | Value600–720 USD | SourceHow Much Does Crawl Space Encapsulation Cost? (2026), HomeGuide, written by Jennifer Carlson (2026-01-14) | Checked2026-10-10 |
| 20 mil vapor barrier material per square foot | Value0.60–0.70 USD per sq ft | SourceHow Much Does Crawl Space Encapsulation Cost? (2026), HomeGuide, written by Jennifer Carlson (2026-01-14) | Checked2026-10-10 |
| 20 mil vapor barrier material per 1,200 sq ft roll | Value720–840 USD | SourceHow Much Does Crawl Space Encapsulation Cost? (2026), HomeGuide, written by Jennifer Carlson (2026-01-14) | Checked2026-10-10 |
State electricity rates, state solar incentives, a national cost per watt, a national residential production factor, a module wattage, a degradation rate, and a sample loan rate are not in this table. They are not verified. Provincial Canadian severance minimums, India's gratuity formula, and South African severance tax are in the same unpublished set.